Thank you for reporting this event (OM2017-043) to the National Energy Board. This message confirms that you have completed your submission to the NEB of all information for this event as listed below. Your contact at the NEB will review all of the material. If any clarification is required, you will be contacted for more information; otherwise, the NEB will close its file for this event. Please note that you will no longer be able to use the link provided previously for access to the online event reporting system. To revise any of the data or provide further information, please contact the NEB at dlerssupport@neb-one.gc.ca.

Following is a list of the data that you have provided to the NEB:

View documents in the NEB regulatory document repository

Event Details - OM2017-043

Event Types

Notification (check only one)

Circumstances

Initial activities will include mobilization and site preparation. Following this, excavation and assessment of indications from an in-line inspection (ILI) tool run will be carried out. After assessment, the appropriate repair, such as recoating and sleeving will be made. Upon completion of all activities, the excavation will be backfilled and the worksite will be restored. This may be followed by post-construction monitoring and, if required, further reclamation work may be conducted during the appropriate seasonal timeframe to restore the worksite to its preconstruction condition.
Per the Enbridge Integrity Management Program, in-line inspections are conducted at specific intervals, investigating for defects such as corrosion, dents and cracking. The ILI results are analyzed and defects meeting Enbridge criteria for field assessment require excavation, assessment and the appropriate repair.
Enbridge identified one directly affected landowner. An Enbridge representative met with the landowner on February 1, 2017. No outstanding concerns have been identified with this proposed integrity dig.
Not specified
Not specified
Not specified
Not specified
Not specified
Enbridge Operations & Maintenance Procedures Manuals; LP/MP Safety Manual; Enbridge Environmental Guidelines for Construction (2013);

Activity Plan

Yes
1
Not specified
Not specified
No
Not specified
2017-03-03
2017-09-30
2017-02-02 12:07 Mountain
2017-02-02 12:13 Mountain

Location

Pipeline

Line 11
N/A
80.7796
Crude Oil

Facility

Not specified
Not specified
Not specified
Not specified

Event Location

Canada
Ontario
Onshore
Ancaster
Line 11 - MP 1872.2426 GW12740

Activity Coordinates

Latitude Longitude
43.20434100 -80.05409500

Contact

Errin
White
Enbridge Pipelines Inc.
10201 Jasper Ave
Edmonton
Alberta
Canada
T5J 3N7
780-420-8802
Not specified
Not specified
Not specified
Not specified
errin.white@enbridge.com

Company

Enbridge Pipelines Inc.
Select all regulations that apply to this event. (Note that different acts may apply depending on the selected company.)
Not specified

Water Body

No
Not specified
Not specified
Yes
No
Not specified
Not specified
Not specified
No
Not specified
Not specified

Documents (1)

OM2017-043 - Final Submission

This is an automated email sent from the National Energy Board (NEB). If clicking on a link in this message does not work, copy the complete link text and paste it into the address line of your browser. Do not reply directly to this message as it comes from an account which is not monitored. If you encounter problems of any kind in using this system, please contact the NEB at dlerssupport@neb-one.gc.ca for assistance.