Thank you for reporting this event (OM2017-043) to the National Energy Board. This message confirms that you have completed your submission to the NEB of all information for this event as listed below. Your contact at the NEB will review all of the material. If any clarification is required, you will be contacted for more information; otherwise, the NEB will close its file for this event. Please note that you will no longer be able to use the link provided previously for access to the online event reporting system. To revise any of the data or provide further information, please contact the NEB at dlerssupport@neb-one.gc.ca.
Following is a list of the data that you have provided to the NEB:
Initial activities will include mobilization and site preparation. Following this, excavation and assessment of indications from an in-line inspection (ILI) tool run will be carried out. After assessment, the appropriate repair, such as recoating and sleeving will be made. Upon completion of all activities, the excavation will be backfilled and the worksite will be restored. This may be followed by post-construction monitoring and, if required, further reclamation work may be conducted during the appropriate seasonal timeframe to restore the worksite to its preconstruction condition.
Per the Enbridge Integrity Management Program, in-line inspections are conducted at specific intervals, investigating for defects such as corrosion, dents and cracking. The ILI results are analyzed and defects meeting Enbridge criteria for field assessment require excavation, assessment and the appropriate repair.
Ground disturbance using power-operated equipment within 30 m of a wetland or a water body, or within 30 m of the substrate of a wetland or water body
Enbridge identified one directly affected landowner. An Enbridge representative met with the landowner on February 1, 2017. No outstanding concerns have been identified with this proposed integrity dig.
Not specified
Not specified
Not specified
Not specified
Not specified
Enbridge Operations & Maintenance Procedures Manuals; LP/MP Safety Manual; Enbridge Environmental Guidelines for Construction (2013);
Activity Plan
Yes
1
Not specified
Not specified
No
Not specified
2017-03-03
2017-09-30
2017-02-02 12:07 Mountain
2017-02-02 12:13 Mountain
Location
Pipeline
Line 11
N/A
80.7796
Crude Oil
Facility
Not specified
Not specified
Not specified
Not specified
Event Location
Canada
Ontario
Onshore
Ancaster
Line 11 - MP 1872.2426 GW12740
Activity Coordinates
Latitude
Longitude
43.20434100
-80.05409500
Company
Enbridge Pipelines Inc.
Select all regulations that apply to this event. (Note that different acts may apply depending on the selected company.)
Not specified
Water Body
No
Not specified
Not specified
Yes
No
Not specified
Not specified
Not specified
No
Not specified
Not specified
Documents (1)
OM2017-043 - Final Submission
This is an automated email sent from the National Energy Board (NEB).
If clicking on a link in this message does not work, copy the complete link text and paste it into the address line of your browser.
Do not reply directly to this message as it comes from an account which is not monitored.
If you encounter problems of any kind in using this system, please contact the NEB at dlerssupport@neb-one.gc.ca for assistance.