Thank you for reporting this event (OM2017-048) to the National Energy Board. This message confirms that you have completed your submission to the NEB of all information for this event as listed below. Your contact at the NEB will review all of the material. If any clarification is required, you will be contacted for more information; otherwise, the NEB will close its file for this event. Please note that you will no longer be able to use the link provided previously for access to the online event reporting system. To revise any of the data or provide further information, please contact the NEB at dlerssupport@neb-one.gc.ca.

Following is a list of the data that you have provided to the NEB:

View documents in the NEB regulatory document repository

Event Details - OM2017-048

Event Types

Notification (check only one)

Circumstances

The Activity will consist of stripping topsoil, excavation, coating removal, pipe assessment, repair and replacement (if required) and recoating. The excavation locations will then be backfilled and reclaimed. All permanent work associated with the Activity is within the existing right-of-way.
The Activity is part of the ongoing pipeline integrity and maintenance program on the NGTL System.
NGTL confirms that all interested parties have been notified of the proposed Activity and that there are no unresolved third party concerns. NGTL will work with stakeholders to address any questions or concerns that arise.
Not specified
Not specified
Not specified
Not specified
Not specified
TransCanada PipeLines Limited's operating procedures and standards will be used for the Activity. Environmental protection measures are included in the Environmental Protection Plan implemented for the Activity.

Activity Plan

Yes
1
Not specified
Not specified
Yes
Based on recent assessment of In-Line Inspection (ILI) results, NGTL confirmed an additional dig is required on the NPS 30 Peace River Mainline Loop (Pipeline). Access to this location is limited and must be done during frozen conditions, prior to spring break-up, in order to minimize environmental impacts, and in order to safely access the site. Accordingly, NGTL requests a relaxation of the 21 working days’ notice in order to ensure the activity can be conducted during frozen conditions.
2017-02-18
2017-03-24
2017-02-10 14:38 Mountain
2017-02-10 14:55 Mountain

Location

Pipeline

PEACE RIVER LATERAL LOOP (PHASE I) - NPS 30
N/A
115.9235
Natural Gas

Facility

Not specified
Not specified
Not specified
Not specified

Event Location

Canada
Alberta
Onshore
Manning
The Activity location is approximately 40 km southwest of Manning, Alberta.

Activity Coordinates

Latitude Longitude
56.62275081 -118.06267572

Contact

David
Yee
TransCanada PipeLines Limited on behalf of NOVA Gas Transmission Ltd.
450-1st Street SW
Calgary
Alberta
Canada
T2P 5H1
403-920-5198
Not specified
Not specified
403-920-2347
Not specified
david_yee@transcanada.com

Company

NOVA Gas Transmission Ltd.
Select all regulations that apply to this event. (Note that different acts may apply depending on the selected company.)
Not specified

Water Body

Yes
15
Yes
Yes
Yes
Yes
Yes
No
No
Not specified
Not specified

Documents (1)

OM2017-048 - Final Submission

This is an automated email sent from the National Energy Board (NEB). If clicking on a link in this message does not work, copy the complete link text and paste it into the address line of your browser. Do not reply directly to this message as it comes from an account which is not monitored. If you encounter problems of any kind in using this system, please contact the NEB at dlerssupport@neb-one.gc.ca for assistance.