A74506-1 Letter to NEB re Application for Line 10 Westover Segment Replacement Project - A4W2K0   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

National Energy Board 517 – 10th Avenue SW Calgary, AB T2R 0A8 Attention: Sheri Young, Secretary of the Board Dear Madam: Re: Enbridge Pipelines Inc. (“Enbridge”) Line 10 Westover Segment Replacement ...
A74506-10 Appendix 4.3 - Fact Sheets - A4W2K9   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Maintenance digs A critical component in preventing pipeline incidents Our goal at Enbridge is, and will always be, the prevention of all incidents. Between 2012 and 2014, we invested $3.78 billion o...
A74506-11 Appendix 4.4 - Fact Sheets - A4W2L3   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Decommissioning, Decommissioning, Decommissioning, Decommissioning, Decommissioning, step byby Step Step by Step Step by Step Step step Step by Step Step by Step. Remove the vast majority of the oil ...
A74506-12 Appendix 4.5 - Presentation Leak Detection - A4W2L5   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Computational Pipeline Monitoring / Leak Detection System Material Balance “Mathematical calculation used to determine whether a leak has developed in a pipeline” Canadian Standards Association Z662 O...
A74506-13 Appendix 4.6 - Presentation to ER Agencies - A4W2L7   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

The Line 10 Westover Segment Replacement Project will address pipeline maintenance requirements, improve reliability and safety of the system, and restore the pipeline to its original operating capaci...
A74506-14 Appendix 4.7 - MOECC Workshop Presentation - A4W2L8   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Application submitted to the NEB Appendix 4.7. People • Our number one priority is the safety of the public and our employees during an incident • We do extensive training on Emergency Response Incid...
A74506-15 Appendix 4.8 - L10 Overview Presentation - A4W2L9   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Line 10 Westover Segment Replacement Project Ensuring continued safe and reliable operations in Ontario Ken Hall Senior Advisor Public Affairs and Communications. Project Scope and Overview • • Proje...
A74506-16 Appendix 4.9 - MOECC Presentation Environment-Goal Zero - A4W2Q0   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Liaise with project team during project planning Identify required environmental permits Oversee pre-disturbance environmental data collection Consult with environmental regulators Develop the project...
A74506-17 Appendix 4.10 - MOECC Presentation Pipelines 101 - A4W2Q2   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Application submitted to the NEB Appendix 4.10. Name: Michael Jespersen Title: Assistant Construction Manager Division:Major Projects. Survey and Line Locating ROW Survey • • • • Boundary & ETWS Sta...
A74506-18 Appendix 4.11 - MOECC Presentation Enbridge Eastern Region Overview - A4W2Q5   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Application submitted to the NEB Appendix 4.11. About Enbridge Pipeline Operations Kent Nikel, Senior Manager Regional Services. Who is this guy… – 21+ years of experience with Enbridge – 8+ years f...
A74506-19 Appendix 4.12 - MOECC Presentation Decommissioning - A4W2Q6   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Typically in-line inspection (ILI) tools are run on a three year cycle Pipeline capacity de-rated Dig programs conducted to repair corrosion features that exceed acceptable thresholds Protect pipeline...
A74506-2 NEB Filing Manual Checklist - A4W2K1   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

A.2.5 Description of the Environmental and Socio-Economic Setting Identify and describe the current biophysical and socio-economic setting of each element (i.e., baseline information) in the area wher...
A74506-20 Appendix 4.13 - MOECC Presentation Pipeline Integrity - A4W2Q7   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Application submitted to the NEB Appendix 4.13. Enbridge Pipelines Inc. Line 10 Westover Segment Replacement Project. Isolat ed Cor rosion Ext en sive Pit t in g Cor rosion in Bot t om of Pipe Gir t...
A74506-21 Appendix 4.14 - MOECC Presentation Risk Management - A4W2R1   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Application submitted to the NEB Appendix 4.14. Enbridge risk management program How does Enbridge assess risk? Esri, HERE, DeLorme, MapmyIndia, © OpenSt reetMap contributors, and the GIS user commu...
A74506-22 Appendix 4.15 - MOECC Presentation Ensuring Continued Safe and Reliable Operations in Ontario - A4W2R2   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Line 10 Westover Segment Replacement Project Ensuring continued safe and reliable operations in Ontario Herb Shields Manager – Government Relations Public Affairs and Communications. Project Scope an...
A74506-23 Appendix 4.16 - Newspaper Ad for Open Houses - A4W2R3   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

We will be applying to the National Energy Board for approval to replace a 35-kilometre segment of the Line 10 pipeline that runs from our Westover Terminal to the Nanticoke Junction. Line 10 Westove...
A74506-24 Appendix 4.17 - Open House Mural - A4W2R7   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

How we build pipelines safely 1 Field surveys and staking: Construction footprint surveys and eld surveys are conducted along the proposed right-of-way (ROW). Crews re-stake the center of the trench,...
A74506-25 Appendix 4.18 - Open House Storyboards - A4W2S4   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Proposed Line 10 Westover Segment Replacement Route Line 10 Existing Route Other Enbridge Pipelines Municipal Boundaries. June 2015 June to November 2015 Initial government, Aboriginal, landowner and...
A74506-26 Appendix 4.19 - Presentation Flamborough Chamber of Commerce - A4W2S7   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Application submitted to the NEB Appendix 4.19. Enbridge in Ontario and the Community – Line 10 & Project Overview – Pipeline Decommissioning – Pipeline Construction – Safety & Emergency Response – E...
A74506-27 Appendix 4.20 - Presentation City of Hamilton General Issues Committee - A4W2S9   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Application submitted to the NEB Appendix 4.20. Westover Segment Replacement Project Making a Safe Pipeline Safer. Enbridge is planning to replace a 35-kilometre (21-mile) segment of our Line 10 pip...