A74508 Enbridge Pipelines Inc. - Line 10 Westover Segment Replacement Project Application - Volume II

My Favourites
Filter by Date Last DayLast WeekLast MonthLast 3 MonthsLast 6 MonthsLast Year
(YYYY-MM-DD)
(YYYY-MM-DD)
Filter by Commodity ElectricityGasOilOther
This will search only documents within the current folder.
Item(s) - 1 to 20 out of about 29
A74508-1 Section 6 Environment and Socio-Economic Assessment - A4W2Q8   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

ENVIRONMENT AND SOCIO-ECONOMIC ASSESSMENT CH2M Energy Canada has prepared a detailed ESA for the Project. A copy of the ESA is provided as Appendix 6.1 of this Application.
A74508-10 Appendix 6.1 - ESA Part 8 of 10 - A4W2U5   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Regardless of whether a project’s activities are included in the DFO activity list or not, proponents are still required to avoid causing serious harm to fish by providing mitigation such as those des...
A74508-11 Appendix 6.1 - ESA Part 9 of 10 - A4W2U6   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Change in water chemistry Change in water temperature Flow alteration (timing, duration, intensity) Diversion Channels Partial constriction of flow (e.g., rip-rap, piers, piles, fill) Complete constri...
A74508-12 Appendix 6.1 - ESA Part 10 of 10 - A4W2U7   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Remaining Second or Third Tier Impacts Yes – bank stability and exposed soils, resuspension and entrainment of sediment, oil, grease and fuel leaks from equipment Yes - oil, grease and fuel leaks. Ch...
A74508-13 Section 7 Engineering - A4W2U8   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Sending Trap PN 100 or ANSI 600 Gr 359 MPa (X52) or Gr 483 MPa (X70 ) or equivalent as per Table 5.3 of CSA Z266215 8.74mm or greater PN 100 or ANSI 600 Gr 359 MPa (X52) or Gr 483 MPa (X70 ) or equiva...
A74508-14 Appendix 7.1 - Global Map - A4W2U9   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Line 10 Westover Segment Replacement Project Newfoundland and Labrador. Application Submitted to the NEB Appendix 7.1. Saint-Pierre et Miquelon New Brunswick Prince Edward Island Nova Scotia. Line1...
A74508-15 Appendix 7.2 - Application Project Regional Map - A4W2V0   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Line 10 Westover Segment Replacement Project TOWNSHIP OF WOOLWICH CITY OF GUELPH TOWNSHIP OF PUSLINCH TOWN OF MILTON CITY OF MISSISSAUGA. TOWNSHIP OF CITY OF WELLESLEY WATERLOO. CITY OF BURLINGTON T...
A74508-16 Appendix 7.3 - Pipe Schematic - A4W2V1   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Application Submitted to the NEB Appendix 7.3. ENBRIDGE PIPELINES INC. 10201 JASPER AVENUE EDMONTON ALBERTA CANADA.
A74508-17 Appendix 7.4 - Class Location Report and Maps (Redacted) - A4W2V2   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

ENBRIDGE PIPELINES INC. LINE 10 WESTOVER SEGMENT REPLACEMENT PROJECT C L AS S L O C A T I O N AS S E S S M E N T R E P O R T. Disclaimer This document represents the work of WorleyParsons Canada Serv...
A74508-18 Appendix 7.5 - DOU plot plan Westover Terminal - A4W2V3   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Application Submitted to the NEB Appendix 7.5. ENBRIDGE PIPELINES INC. 10201 JASPER AVENUE EDMONTON ALBERTA CANADA.
A74508-19 Appendix 7.6 - DOU plot plan Nanticoke Junction - A4W2V4   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Application Submitted to the NEB Appendix 7.6. ENBRIDGE PIPELINES INC. 10201 JASPER AVENUE EDMONTON ALBERTA CANADA.
A74508-2 Appendix 6.1 - ESA Part 1a of 10 - A4W2R0   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

This environmental assessment includes the construction and operation of the replacement pipeline and the decommissioning of the existing pipeline, taking into account the factors listed in the NEB Fi...
A74508-20 Appendix 7.7 - Preliminary Master Crossing List - A4W2V5   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Municipality of Hamilton-Wentworth Sun Canadian Sun Canadian Public Authority of Having Jurisdiction Enbridge Inc. Enbridge Inc. Department of Highways. Public Authority of Having Jurisdiction Her Ma...
A74508-21 Appendix 7.8 - Route Maps for Application - A4W2V6   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Line 10 Westover Segment Replacement Project E § UTM Coordinates Line10 Replacement Permanent Easement 10 m Workspace Ontario Townships Mainline Valves Facilities. Line 10 Westover Segment Replacemen...
A74508-22 Appendix 7.9 - Decommissioning Technical Report - A4W2V7   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Enbridge Pipelines Inc. Line 10 Westover Segment Replacement Project Decommissioning Technical Report. As part of the Line 10 Westover Segment Replacement Project , Enbridge proposes to design and co...
A74508-23 Section 8 Land Matters - A4W2V8   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Approximately 24 km or 69% of the pipeline will be constructed alongside and contiguous to an existing Enbridge pipeline ROW and other linear disturbances, with 11 km or 31% requiring new non-contiguo...
A74508-24 Appendix 8.1 - Land Matters Sample NEB S 87 Notice - A4W2V9   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Description of Lands Required for Pipeline (See attached Property Sketch) To accommodate the construction and installation of the [check one] pipeline pipelines through your above described property...
A74508-25 Appendix 8.2 - Land Matters Sample Grant of Easement Agreement - A4W2W0   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Upon such discontinuance, the Transferee will cause a release of this grant of easement to be registered in the applicable land registry office on title to the Easement Land. perform the obligations ...
A74508-26 Appendix 8.3 - Land Matters Sample Temporary Workspace Easement Agreement Ontario - A4W2W1   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

Owner hereby grants to Enbridge, during the Term, the right to enter upon the 1.7 Optioned Property, at such times as are agreed to by the Parties, acting reasonably, to allow Enbridge. In the event ...
A74508-27 Section 9 Security Management - A4W2W2   Date: 2015-12-04
Submitter:
Enbridge Pipelines Inc.

SECURITY MANAGEMENT Enbridge is aware of and will follow OPR Section 47.1 and has a security management program in operation for all its pipeline systems and facilities. The security management progr...