A81822-1 NEB MO-036-2012 - 2016 FILING - A5I9Y5   Date: 2017-02-23
Submitter:
Laura Jehn, VP Asset Management

D Xerox WorkCentre Xerox WorkCentre
A81819-1 VME Project - Cond. 15 Construction Progress Report No. 6 - A5I9V7   Date: 2017-02-22
Submitter:
TransCanada PipeLines Limited

February 22, 2017 Filed Electronically National Energy Board Suite 210, 517 Tenth Avenue SW Calgary, Alberta T2R 0A8 Attention: Ms. Sheri Young, Secretary of the Board Dear Ms. Young: Re: TransCanada ...
A81781-1 Correspondence to the NEB - A5I9C9   Date: 2017-02-17
Submitter:
Pembina Prairie Facilities Ltd.

Part (b) states the following: (b) at least 90 days from completion of the Baseline ILI, file with the Board the following: i. the pipeline ILI assessment, ii. proposed mitigation measures (based on I...
A81759-2 Trans Mountain Appendix A Condition 12a - A5I8K1   Date: 2017-02-16
Submitter:
Trans Mountain Pipeline ULC

TABLE 1 DEFINITIONS OF ABORIGINAL, LOCAL AND REGIONAL Term Aboriginal Definition Aboriginal Peoples who have self-identified as such. The TMEP Training Policy for Aboriginal Peoples (Appendix A) guid...
A81758-2 Trans Mountain Appendix A Condition 11a - A5I8J8   Date: 2017-02-16
Submitter:
Trans Mountain Pipeline ULC

National Energy Board (NEB) Condition 11a Aboriginal, local, and regional skills and business capacity inventory a) Trans Mountain must file with the NEB, at least 6 months prior to commencing constru...
A81759-1 Trans Mountain Cover Letter Condition 12a - A5I8K0   Date: 2017-02-16
Submitter:
Trans Mountain Pipeline ULC

Please find enclosed Trans Mountain’s compliance filing in relation to Project Condition 12(a) for approval by the Board. Phased Filings On January 16, 2017, Trans Mountain filed a Phased Condition M...
A81760-1 Trans Mountain Cover Letter Condition 14 - A5I8K3   Date: 2017-02-16
Submitter:
Trans Mountain Pipeline ULC

Condition 14: TWG – Terms of Reference The text of Condition 14, as established by the Board, is as follows: Trans Mountain must file with the NEB, at least 6 months prior to commencing construction, ...
A81758-1 Trans Mountain Cover Letter Condition 11a - A5I8J7   Date: 2017-02-16
Submitter:
Trans Mountain Pipeline ULC

Please find enclosed Trans Mountain’s compliance filing in fulifllment of Project Condition 11(a). Phased Filings On January 16, 2017, Trans Mountain filed a Phased Condition Matrix (A4I1J9) with the...
A81760-2 Trans Mountain Appendix A Condition 14 - A5I8K4   Date: 2017-02-16
Submitter:
Trans Mountain Pipeline ULC

Further information on TWG contacts can be found in Section 2.2 and in Appendix B. The establishment of TWGs requires participation by both parties, and while Trans Mountain is vigorously pursuing est...
A81761-1 Trans Mountain Cover Letter Condition 30a(iii iv) b c d - A5I8K6   Date: 2017-02-16
Submitter:
Trans Mountain ULC

Note that Trans Mountain will file additional material in fulfilment of Condition 30(a)(iii)(iv), (b), (c) and (d) insofar as it relates to the Line 1 and Line 2 Pump Stations (legal instruments XO-T2...
A81761-6 Trans Mountain Appendix 2B Condition 30 - A5I8L1   Date: 2017-02-16
Submitter:
Trans Mountain ULC

MCC BREAKER TAGS TO BE PREFIXED WITH MCC BREAKER TAGS TO BE PREFIXED WITH "WT-ESB3-MCC1-". MCC BREAKER TAGS TO BE PREFIXED WITH MCC BREAKER TAGS TO BE PREFIXED WITH "WT-ESB3-MCC2-". MCC BREAKER TAGS...
A81761-2 Trans Mountain Report Condition 30 - A5I8K7   Date: 2017-02-16
Submitter:
Trans Mountain ULC

XO-T260-010-2016 (TANKS) Refer to Section 5.1.3 Edmonton Terminal 5.2.3 Sumas Terminal 5.3.3 Burnaby Terminal Refer to Section 5.1.3 Edmonton Terminal 5.2.3 Sumas Terminal 5.3.3 Burnaby Terminal Refer...
A81761-3 Trans Mountain Appendix A Condition 30 - A5I8K8   Date: 2017-02-16
Submitter:
Trans Mountain ULC

D Adobe Acrobat Adobe Acrobat steerob2 D TRANS MOUNTAIN PIPELINE
A81761-4 Trans Mountain Appendix B Condition 30 - A5I8K9   Date: 2017-02-16
Submitter:
Trans Mountain ULC

Condition 30 Appendix B TMEP-ELEC-1070S Fuses 750 volts to 7.2kV Specification TMEP-ELEC-1080S Circuit Breaker – 5kV to 25kV Specification TMEP-ELEC-1085S Circuit Breaker – 5kV in Switchgear Specifica...
A81761-8 Trans Mountain Appendix 5A2 Condition 30 - A5I8L3   Date: 2017-02-16
Submitter:
Trans Mountain ULC

D Adobe Acrobat Adobe Acrobat steerob2 D TRANS MOUNTAIN PIPELINE
A81761-5 Trans Mountain Appendix 2A Condition 30 - A5I8L0   Date: 2017-02-16
Submitter:
Trans Mountain ULC

WT-ESB1-MCC1 ANSI Sym 3P LV 3 0.6 k A To Operator Control BRK Interrupting Duty 35.2 kA Dev Int Rating 35.0 kA WT-ESB1-PNL1 BRK Interrupting Duty 31.6 kA Dev Int Rating 35.0 kA WT-ESB1-PNL3 BRK Interr...
A81761-9 Trans Mountain Appendix 5B Condition 30 - A5I8L4   Date: 2017-02-16
Submitter:
Trans Mountain ULC

D Adobe Acrobat PScript5.dll Version steerob2 D TRANS MOUNTAIN PIPELINE
A81761-7 Trans Mountain Appendix 5A1 Condition 30 - A5I8L2   Date: 2017-02-16
Submitter:
Trans Mountain ULC

Arc Flash and Protection Coordination Study – Objectives and Standards The objectives of the Arc Flash and Protection Coordination Study are as follows: Complete a combined Arc Flash and Protection Co...
A81765-2 Trans Mountain Appendix A Condition 33 - A5I8Q9   Date: 2017-02-16
Submitter:
Trans Mountain ULC

Appendix A: TABLE OF CONCORDANCE Condition 33 is applicable to legal instrument OC-064 (CPCN). The table below describes how the Report addresses the requirements of Condition 33. NEB Condition 33 T...
A81761-10 Trans Mountain Appendix 5C1 Condition 30 - A5I8L5   Date: 2017-02-16
Submitter:
Trans Mountain ULC

BB-ESB5-MCC ANSI Sym 3P LV 6.0 kA BM-78 Bkr Int Duty 6.0 kA Int Rating 35.0 kA ESB5-LP1 Bkr Int Duty 6.0 kA Int Rating 25.0 kA ESB5A-MCC LINE Bkr Int Duty 6.0 kA Int Rating 35.0 kA ESB5B-MCC LINE Bkr ...