My Favourites
Remove All Filters
Filtered by Environmental Report
Remove Filter
Filter by Date Last DayLast WeekLast MonthLast 3 MonthsLast 6 MonthsLast Year
(YYYY-MM-DD)
(YYYY-MM-DD)
Filter by Commodity ElectricityGasOilOther
 Filtered by: Environmental Report
This will only search for documents within selected categories.

Matching Items

Item(s) - 1 to 20 out of about 490
A81456-2 Eyehill 13-20-040-28 W3M - Phase 1 ESA Report (SK) 12-Dec-2016 - A5I3U2   Date: 2017-01-25
Submitter:
Ana Tarbuk

Prepared for: Husky Oil Operations Limited 707 – 8th Avenue SW Calgary, Alberta T2P 3G7 Prepared by: Ridgeline Environment a Division of Ridgeline Canada Inc. th #101, 3016-19 Street NE Calgary, Alber...
A81456-3 Eyehill 16-24-040-01 W4M - Phase 1 ESA Report (AB) 15-Dec-2016 - A5I3U3   Date: 2017-01-25
Submitter:
Ana Tarbuk

Prepared for: Husky Oil Operations Limited 707 – 8th Avenue SW Calgary, Alberta T2P 3G7 Prepared by: Ridgeline Environment a Division of Ridgeline Canada Inc. th #101, 3016-19 Street NE Calgary, Alber...
A81457-2 Marsden Salt Water Pipeline Abandonment - Phase 1 ESA Report (AB) - A5I3U6   Date: 2017-01-25
Submitter:
Shawn Gowrie

Prepared for: Husky Oil Operations Limited 707 – 8th Avenue SW Calgary, Alberta T2P 3G7 Prepared by: Ridgeline Environment a Division of Ridgeline Canada Inc. th #101, 3016-19 Street NE Calgary, Alber...
A81457-3 Marsden Salt Water Pipeline Abandonment - Phase I ESA Report (SK) - A5I3U7   Date: 2017-01-25
Submitter:
Shawn Gowrie

The operator did not identify any areas of environmental concern associated with the pipeline area; The landowner contact information for 10-28-044-28 W3M could not be found, therefore the interview c...
A79418-1 HONI_NEB_J5D_Information_Update_20160915 - A5F1D4   Date: 2016-09-15
Submitter:
Hydro One

Also attached is the Keith TS J5D Corridor Assessment, Towers #5 to #8- SAR Support, species at risk study and report undertaken along the J5D corridor along which the refurbishment will take place. ...
A78586-1 HONI_NEB_J5D_Update_20160718 - A5D9L7   Date: 2016-07-18
Submitter:
Hydro One Networks

LIST OF APPENDICES Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Site Specific Issues Erosion and Sediment Controls Criteria to Re‐Use Contaminated Soil on Hydro One Owned Property...
A78552-2 Attachment 1 - Environmental Protection Plan - Rev 0 - A5D8Y1   Date: 2016-07-15
Submitter:
Enbridge Pipelines Inc.

Enbridge Pipelines Inc. (Enbridge) is planning to replace approximately 35 km of the existing Line 10 pipeline as part of the Line 10 Westover Segment Replacement Project (the Project). Industry stan...
A75483-1 Goodrich Extension Re-Injection Pipeline 2015 Reclamation Report - A4Y0U8   Date: 2016-02-10
Submitter:
Westcoast Energy Inc., carrying on business as Spectra Energy Transmission (Westcoast)

Moderate vegetation establishment Vegetation from KP 1.26 to KP 1.42, KP 1.49 to Monitor vegetation establishment in Establishment / Soil 2015. Low vegetation establishment from Reseed in spring and ...
A75387-1 T-North_2012_Third_Year_PCEM_Report_Part1 - A4X9K6   Date: 2016-01-31
Submitter:
Westcoast Energy Inc., carrying on Business as Spectra Energy Transmission (Westcoast)

(b) Degradation of soil structure and lowering of soil productivity through compaction and rutting Various • Compaction was observed from KP 3.192 to KP 3.325, 13.333 to KP 13.350, and KP 13.901 to KP...
A75387-3 T-North_2012_Third_Year_PCEM_Report_Part3 - A4X9K8   Date: 2016-01-31
Submitter:
Westcoast Energy Inc., carrying on Business as Spectra Energy Transmission (Westcoast)

Strip topsoil from the entire ROW on agricultural land with shallow Beryl soils requiring three-lift soils handling as indicated in the topsoil handling depth line and by (xx) on the Environmental Ali...
A75387-2 T-North_2012_Third_Year_PCEM_Report_Part2 - A4X9K7   Date: 2016-01-31
Submitter:
Westcoast Energy Inc., carrying on Business as Spectra Energy Transmission (Westcoast)

D Adobe PDF Library Acrobat PDFMaker for Word Prepared for
A75362-2 2015 Post Construction Reclamation Assessment Report 29Jan2016 - A4X8Z9   Date: 2016-01-29
Submitter:
Plains Midstream Canada ULC

D Xerox WorkCentre Xerox WorkCentre
A75293-1 Saint Sebastien Loop - Condition 5(b)-Annual Environmental Monitoring Report - A4X7Z4   Date: 2016-01-26
Submitter:
TransCanada PipeLines Limited

SUIVI DES CULTURES Un suivi des cultures a également été poursuivi durant la saison de croissance 2015 afin d’évaluer l’état des cultures sur les aires de travail situées sur les lots P-187, P-186 et ...
A75155-1 NGTL Norma Transmission Pipeline Project - Year 2 PCMR - A4X6C8   Date: 2016-01-14
Submitter:
NOVA Gas Transmission Ltd.

In July 2013, NOVA Gas Transmission Ltd. (NGTL), a wholly owned subsidiary of TransCanada PipeLines Limited (TransCanada), received National Energy Board (NEB) approval pursuant to Section 58 of the N...
Attachment C-Matrix Phase 1 ESA_11-36-011-01W4M to 08-02-012-30W3M_July 2015 - A4S9Y3   Date: 2015-08-28
Submitter:
Enerplus Corporation

Full Company Name that will appear on reclamation certificate 1.2 Alberta Energy Regulator Information Not Applicable Not Applicable Maple Creek Gas Pipeline (NEB Facility) Not Applicable Not Applicab...
Attachment A-Matrix 2014-Soil Assessment-11-36-011-01W4M to 08-02-012-30W3M - A4S9Y1   Date: 2015-08-28
Submitter:
Enerplus Corporation

Excavation #1 - 16-36-011-01 W4M • • Field-screening results for EC in Excavation #1 (Figure 6) and excavated topsoil and subsoil ranged from 0.23 to 0.68 mS/cm. Particle-size analysis indicated soil ...
AR5_SYR_FINAL_SPM - A4S2U2   Date: 2015-08-15
Submitter:
Salt Spring Island Climate Action Council Society

This summary follows the structure of the longer report which addresses the following topics: Observed changes and their causes; Future climate change, risks and impacts; Future pathways for adaptatio...
Eelgrass Habitat Mapping in the Salish Sea - A4R8A9   Date: 2015-07-28
Submitter:
Walker, Vicki-Marie

Between 2012 and 2014, eelgrass habitats were mapped along the shores of the following areas: Ballenas-Winchelsea, Bowen, Denman, Gabriola, Galiano, Gambier, Hornby, Lasqueti, Mayne, North and South P...
Pages from Environmental and Socio-Economic Assessment Section 58 Application Rev 3 pg 401-525 - A4R5S1   Date: 2015-07-17
Submitter:
Husky Oil Limited

Husky Oil Limited (Husky) is applying to the National Energy Board (NEB) to construct the Border Crude Oil Pipeline Expansion (Border Expansion) between the Lloydminster Pipeline Terminal (14-01-50-01...
Pages from Environmental and Socio-Economic Assessment Section 58 Application Rev 3 pg 1 - 250 - A4R5R9   Date: 2015-07-17
Submitter:
Husky Oil Limited

Executive Summary This environmental and socio-economic assessment (ESA) supports an application by Husky Oil Limited to construct the Condensate Border Pipeline Project (the Project) at the City of L...
Some of the material on this site originates with organizations not subject to the Official Languages Act and is available in the language in which it was written.
Certains des textes sur ce site proviennent d'organismes qui ne sont pas assujettis à la Loi sur les langues officielles et ils sont disponibles dans la langue d'origine.