EPSI_23A_GW81910_Preliminary_Assessment_Form - A4E3U9   Date: 2014-11-04
Submitter:
Enbridge Pipelines (Westspur) Inc.

GENERAL DIG SITE INFORMATION Surrounding Land Use: Comments: A Stantec representative surveyed the dig site while accompanied by an EPSI inspector. WETLANDS Dig site: Wetland(s) Present: Distance fro...
EPSI_23A_GW85560_Preliminary_Assessment_Form - A4E3T9   Date: 2014-11-04
Submitter:
Enbridge Pipelines (Westspur) Inc.

Are there any watercourse crossings to access the proposed dig site? Type of watercourse (general description): Culvert Type of crossing required: Ice Bridge If yes, does it have defined beds and bank...
Fish Habitat Checklist GW28430 - A4D4Y3   Date: 2014-10-21
Submitter:
Enbridge Pipelines (Westspur) Inc.

GENERAL DIG SITE INFORMATION Surrounding Land Use: Comments: A Stantec representative surveyed the dig site while accompanied by an EPSI inspector. VEGETATION Composition of vegetation: (list species...
A3E9X4 - Rapport d'examen environnemental préalable   Date: 2013-01-28
Submitter:
NEB

NOVA Gas Transmission Ltd. (NGTL) a demandé à l’Office national de l’énergie (l’Office ou l’ONÉ) de l’autoriser à construire et exploiter la station de comptage au point de vente Germain qu’elle propo...
A42334-3 NEB - Decision - NOVA Gas - Leismer to Kettle River Environmental Screening Report - GH-004-2011   Date: 2012-06-21
Submitter:
NEB
A42334-4 ONÉ - Décision - NOVA Gas - Leismer à Kettle River rapport d’évaluation environnementale - GH-004-2011   Date: 2012-06-21
Submitter:
NEB
A2U1Z8 - ESR Enbridge Line 9 Equiterre ED comments 2012.06.19   Date: 2012-06-19
Submitter:
Albert Koehl - Ecojustice

D Canon iR C3480 Canon iR C3480 Image D
A2U1I9 - Leismer to Kettle River Crossover - Comments on Draft Environmental Screening Report   Date: 2012-06-15
Submitter:
NOVA Gas Transmission Ltd.

Calgary, Alberta T2P 0X8 Attention: Ms. Sheri Young, Secretary of the Board Dear Ms. George: Re: NOVA Gas Transmission Ltd. (NGTL) Leismer to Kettle River Crossover (the Project) Hearing Order GH-004-...
A2U0R9 - St. Clair Pipelines Management Inc. rapport d_examen environnemental prealable   Date: 2012-06-13
Submitter:
NEB

La demande concernant le projet a été déposée en vertu du paragraphe 58(1) de la Loi sur l’Office national de l’énergie (Loi sur l’ONÉ), qui déclenche l’application du Règlement sur les dispositions l...
A2U0R8 - St. Clair Pipelines Management Inc. Environmental Screening Report   Date: 2012-06-13
Submitter:
NEB

St. Clair Pipelines Management Inc. (SCPLMI), as general partner on behalf of St. Clair Pipelines L.P., is proposing to construct and operate the Bluewater River Crossing Replacement Project (the Proj...
A2U0L6 - Environmental Screening Report   Date: 2012-06-13
Submitter:
NEB

Alliance Pipeline Ltd (Alliance) is proposing to relocate a portion of their existing dense phase natural gas pipeline further from the Eagle River Casino on the Alexis Nakota Sioux Nation Reserve (th...
A2U0L7 - Environmental Screening Report (Pending Translation)   Date: 2012-06-13
Submitter:
NEB
A2U0K6 - Environmental Screening Report sent to NOVA Chemicals for the Genesis Pipeline Canada Ltd   Date: 2012-06-13
Submitter:
NEB

Genesis Pipeline Canada Ltd. (GPCL), a wholly-owned subsidiary of NOVA Chemicals (Canada) Ltd. (NOVA Chemicals), is proposing to construct and operate approximately 8.8 km of pipeline and two new valv...
A2U0K7 - Rapport d’examen environnemental émis à NOVA Chemicals pour Genesis Pipeline Canada Ltd (Pending Translation)   Date: 2012-06-13
Submitter:
NEB
A2T8R5 - Letter and Draft Environmental Screening Report   Date: 2012-06-05
Submitter:
NEB

Comments can be served on Enbridge either electronically via the Board’s website or by facsimiles sent to Enbridge at 403-767-3863. Line 9 Reversal Phase I Project Applicant Name: Application Date: N...
A2T8R6 - Lettre et Ébauche du rapport d'examen environmental préalable   Date: 2012-06-05
Submitter:
NEB

S’il était autorisé, le projet permettrait de transporter du pétrole brut d’ouest en est dans la canalisation 9 existante d’Enbridge, du terminal de Sarnia à la station de pompage de North Westover po...
A2T8E0 - Leismer to Kettle River Application - Letter and Draft Environmental Screening Report   Date: 2012-06-01
Submitter:
NEB

Baseline Information and Sources The analysis for this draft Environmental Screening Report (ESR) is based on information from various sources including: • NGTL's Project application package, includin...
A2T6L3 - Environmental Screening Report   Date: 2012-05-29
Submitter:
NEB

NOVA Gas Transmission Ltd. (NGTL) applied to the National Energy Board (Board or NEB) for authorization to construct and operate the proposed Germain Sales Meter Station and associated facilities (the...
A2T2A9 - Environmental Screening Report / Rapport d’examen environnemental préalable   Date: 2012-05-15
Submitter:
NEB

On 6 March 2008, the National Energy Board (NEB or Board) approved Trans Mountain Pipeline Inc. (Trans Mountain) Edmonton Terminal Expansion Project (Order XO-T246-04-2008). If the current modificati...
A2S0K6 - Environmental Screening Report Rapport Environmental - Bear Creek Meter Station   Date: 2012-04-05
Submitter:
NEB

Bear Creek Meter Station Applicant Name: Application Date: National Energy Board (NEB or Board) File Number: CEA Act Law List Trigger: Alliance Pipeline Ltd. 04 January 2012 OF-FAC-GasA159-2012-01 01 ...