My Favourites
Remove All Filters
Filtered by Errata
Remove Filter
Filter by Date Last DayLast WeekLast MonthLast 3 MonthsLast 6 MonthsLast Year
(YYYY-MM-DD)
(YYYY-MM-DD)
Filter by Commodity ElectricityGasOilOther
 Filtered by: Errata
This will only search for documents within selected categories.

Matching Items

Item(s) - 1 to 20 out of about 400
A81696-2 Erratum - Ordonnance GO-015-2017 - A5I7K1   Date: 2017-02-10
Submitter:
National Energy Board

OFFICE NATIONAL DE L’ÉNERGIE La secrétaire de l’Office, Original signé par L. George pour.
A81696-1 Erratum to Order GO-015-2017 - A5I7K2   Date: 2017-02-10
Submitter:
National Energy Board

Original signed by L. George for. Sheri Young Secretary of the Board.
04_Boundary Lake_Plan_Profile_Titlepage_Errata - A5I1Q8   Date: 2017-01-17
Submitter:
NOVA Gas Transmission Ltd.

UNIT ADDITION ALCES RIVER COMPRESSOR STATION NW13-85-13-6. Mainline Loop 97 Boundary Lake Section (2017) Existing NGTL System Waterbody Watercourse Primary Highway Secondary Highway Minor Roads Railw...
05_Bear Canyon_Book of Reference_Errata - A5I1Q9   Date: 2017-01-17
Submitter:
NOVA Gas Transmission Ltd.

Land Description SE SEC‐05 TWP‐079 RGE‐09 W6M NE SEC‐05 TWP‐079 RGE‐09 W6M NW SEC‐05 TWP‐079 RGE‐09 W6M NE SEC‐06 TWP‐079 RGE‐09 W6M SE SEC‐07 TWP‐079 RGE‐09 W6M SW SEC‐07 TWP‐079 RGE‐09 W6M. Land De...
02_Errata List - PPBoRs - A5I1Q6   Date: 2017-01-17
Submitter:
NOVA Gas Transmission Ltd.

NGTL SYSTEM EXPANSION PROJECT – ERRATA FOR PLAN, PROFILES AND BOOKS OF REFERENCE. Northwest Mainline Loop – Boundary Lake Section: Book of Reference (NEB Filing ID: A5H9Z5). Northwest Mainline Loop ...
03_Boundary Lake Book of Reference_Errata - A5I1Q7   Date: 2017-01-17
Submitter:
NOVA Gas Transmission Ltd.

TRAPPER TPA 2598 (LARRY RYAN SMITH) TRAPPER TPA 2598 (LARRY RYAN SMITH) TRAPPER TPA 2598 (LARRY RYAN SMITH) TRAPPER TPA 2598 (LARRY RYAN SMITH) TRAPPER TPA 2598 (LARRY RYAN SMITH) TRAPPER TPA 2598 (LA...
06_McLeod River Book of Reference_Errata - A5I1R0   Date: 2017-01-17
Submitter:
NOVA Gas Transmission Ltd.

NPS 48 Grande Prairie Mainline Loop No. 2 ‐ McLeod River Section (2017) Book of Reference ‐ Revision 1. NPS 48 Grande Prairie Mainline Loop No. 2 - McLeod River Section (2017) Book of Reference - Rev...
08_Christina River Book of Reference_Errata - A5I1R2   Date: 2017-01-17
Submitter:
NOVA Gas Transmission Ltd.

NE SEC‐35 TWP‐079 RGE‐06 W4M NE SEC‐35 TWP‐079 RGE‐06 W4M ROAD ALLOWANCE NW SEC‐36 TWP‐079 RGE‐06 W4M NW SEC‐36 TWP‐079 RGE‐06 W4M. SE SEC‐30 TWP‐079 RGE‐05 W4M SE SEC‐30 TWP‐079 RGE‐05 W4M ROAD ALLO...
07_Pelican Lake Book of Reference_Errata - A5I1R1   Date: 2017-01-17
Submitter:
NOVA Gas Transmission Ltd.

NPS 30 Liege Lateral Loop No.2 - Pelican Lake Section (2017) Book of Reference - Revision 1 Tract Number LP-001 Municipality REGIONAL MUNICIPALITY OF WOOD BUFFALO Land Description THEORETICAL NE1/4, S...
A80695-1 NEB Saint John Panel Session - Transcript Changes to Volume 12 - A5H1G9   Date: 2016-11-21
Submitter:
Repsol Energy Canada Ltd.

Borden Ladner Gervais LLP Centennial Place, East Tower 1900, 520 - 3rd Ave SW Calgary, AB, Canada T2P 0R3 T 403.232.9500 F 403.266.1395 blg.com. On August 10 and 11, 2016, we filed several changes to...
A80024-1 Letter to NEB re Errata for Line 10 Westover Segment Replacement Project - A5G0S3   Date: 2016-10-17
Submitter:
Enbridge Pipelines Inc.

Attention: Sheri Young, Secretary of the Board. Dear Madam: Re: Enbridge Pipelines Inc. (“Enbridge”) Line 10 Westover Segment Replacement Project (“Project”) Hearing Order OH-001-2016 File Number OF-...
A80024-2 Errata - Line 10 Westover Segment Replacement Project - A5G0S4   Date: 2016-10-17
Submitter:
Enbridge Pipelines Inc.

Enbridge Pipelines Inc. Line 10 Westover Segment Replacement Project File No. OF-Fac-Oil-E101-2015-09-02 Hearing Order OH-001-2016 Reason for Change. Application – Volume II - At Adobe page 3, Table ...
A79497-1 Union Gas Limited - Exhibit C9-10 - STS Proceeding Information Request Response Revision - TransCanada 1.6 (d) - A5F2U7   Date: 2016-09-22
Submitter:
Union Gas Limited

Further to paragraphs 2718-2723 of the National Energy Board’s RH-001-2016 Hearing Transcript Volume 3 ( A79537-1), please find attached for electronic filing Union Gas Limited’s revised response to T...
A79522-1 Application to Amend - A5F2K4   Date: 2016-09-21
Company:
Submitter:
Manitoba Hydro

An Application by Manitoba Hydro for authorization and exemption related to a deviation for the Riel international power line. Pursuant to section 10 of the National Energy Board Rules of Practice an...
A79420-2 2016-09-15 - EGDI Errata - A5F1D9   Date: 2016-09-15
Submitter:
Enbridge Gas Distribution Inc.

At Adobe page 14, Q/A 22, lines 12‐13 read: “STS injections will be A5D6F2 further restricted, since only 71% of the Withdrawal Quantity… It should read: “STS injections will be further restricted, si...
A79076-1 Consolidated Application Errata Vol 17 Cover Letter - A5E6R4   Date: 2016-08-23
Submitter:
Energy East Pipeline Ltd. and TransCanada PipeLines Limited

August 2016 National Energy Board 517 Tenth Avenue SW Calgary, AB T2R 0A8 Attention: Ms. Sheri Young, Secretary of the Board Dear Ms. Young: Re: Energy East Pipeline Ltd. (Energy East) TransCanada Pip...
A79076-2 Attachments 1 and 2 to Volume 17 Errata - August 2016 - A5E6R5   Date: 2016-08-23
Submitter:
Energy East Pipeline Ltd. and TransCanada PipeLines Limited

Part A: Marine Terminal Complex Section 11: Marine Wildlife and Wildlife Habitat. construction of the marine terminal complex (e.g., pile driving, use of barges and support vessels for installation o...
A78748-1 Consolidated Application Errata Vol 1, 2, 10, 17, 19 - A5E1V8   Date: 2016-07-28
Submitter:
Energy East Pipeline Ltd. and TransCanada PipeLines Limited

Volume 1, Application and Project Overview Volume 1, Application and Project Overview Volume 1, Application and Project Overview Volume 1, Application and Project Overview Volume 1, Application and Pr...
A78440-2 STS Proceeding Written Evidence - Page 15 Revision - A5D7J8   Date: 2016-07-06
Submitter:
Union Gas Limited

The proposed revenue requirements for 2015 to 2020; The proposed three-step toll design for 2015 to 2020, which included a 155%55% increase in EOT short-haul FT tolls; TransCanada’s applied-for incen...
A77610-1 VME Project - Oral Hearing Transcript Corrections - A5C7I1   Date: 2016-06-15
Submitter:
TransCanada PipeLines Limited

Sent By Electronic Mail National Energy Board 517 10th Avenue SW Calgary, AB T2R 0A8 Attention: Ms. Sheri Young, Secretary of the Board Dear Madam: Re.: TransCanada PipeLines Ltd. (“TransCanada”) Vaug...
Some of the material on this site originates with organizations not subject to the Official Languages Act and is available in the language in which it was written.
Certains des textes sur ce site proviennent d'organismes qui ne sont pas assujettis à la Loi sur les langues officielles et ils sont disponibles dans la langue d'origine.