My Favourites
Remove All Filters
Filtered by Supplemental Information
Remove Filter
Filter by Date Last DayLast WeekLast MonthLast 3 MonthsLast 6 MonthsLast Year
(YYYY-MM-DD)
(YYYY-MM-DD)
Filter by Commodity ElectricityGasOilOther
 Filtered by: Supplemental Information
This will only search for documents within selected categories.

Matching Items

Item(s) - 1 to 20 out of about 8100
A81828-8 Attachment 12_Consultation Matters Summary - A5J0C0   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

C1: The consultation program for the Project is guided by TransCanada’s Stakeholder Commitment Statement and TransCanada’s corporate values of safety, integrity, innovation and collaboration. C3-2: O...
A81828-9 Attachment 13_Aboriginal Matters Summary - A5J0C1   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

The Aboriginal Engagement Program for the Project is guided by TransCanada’s Aboriginal Relations Policy and TransCanada’s corporate values of safety, integrity, responsibility and collaboration. Tra...
A81828-5 Attachment 09_Engineering Matters Summary - A5J0A7   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

TransCanada has determined that the Project meets the Canadian Standards Association (CSA) criteria for designation as a Class 2 location, where the Project is in proximity to residences and commercia...
A81828-10 Attachment 14_Land Matters Summary - A5J0C2   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

L2: The Project will not extend beyond existing TransCanada property limits, though approximately 0.10 ha of temporary workspace may be required on a previously disturbed and graveled area owned by th...
A81828-7 Attachment 10_Environmental Assessment Summary - A5J0A9   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

The Project is located on TransCanada owned land approximately 90 metres (m) southeast of the intersection of Hawthorne Road and Hunt Club Road, in Concession 6, Lot 6 in the City of Ottawa, Ontario. ...
A81828-18 Attachment 05_Preliminary Standards and Specifications List - A5J0D0   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

Attachment 5 Preliminary Standards and Specifications List. Preliminary Standards and Specifications List (cont’d) Name HYDROTESTING TEN-PRES Pressure Testing Standard (CDN) TES-PRES Pipeline and Fac...
A81828-6 Attachment 11_Interactions Table - A5J0A8   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

Should high winds or heavy rains damage the tackifier during construction, the Environmental Inspector(s) or designate, in consultation with the Construction Manager, may implement contingency measure...
A81828-14 Attachment 01_LTO Exemption Request - A5J0C6   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

The pipe modifications include installation of a NPS 12 by NPS 20 tee assembly with NPS 12 and NPS 20 valves. TransCanada seeks exemption from the requirement to obtain LTO from the Board prior to pl...
A81828-17 Attachment 04_Preliminary PID - A5J0C9   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

Attachment 4 Preliminary Process and Instrumentation Diagram.
A81828-16 Attachment 03_Preliminary Plot Plan - A5J0C8   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

D Adobe Acrobat Pro Adobe Acrobat Pro shawna_collins D TransCanada
A81830-7 Attachment 10_Environmental Assessment Summary - A5J0E5   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

Based on existing data, species ranges, and available habitat on the Project footprint, three plant species of management concern, including two species at risk (i.e., butternut and American ginseng),...
A81829-2 NEB Permit Notice of Publication - French.doc.pdf - A5J0D3   Date: 2017-02-23
Submitter:
TPS Corp.

Les Instructions relatives à la procédure énoncées ci-après exposent en détail la démarche qui sera suivie. Il est aussi possible de consulter un exemplaire de la demande pendant les heures normales ...
A81828-15 Attachment 02_Technical Description - A5J0C7   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

METER STATION DESCRIPTION Pipeline Design Specifications Description of Analysis System CSA Z662-15 A Gas Chromatograph (GC) will be installed. Pressure control (PC) and overpressure protection (OPP)...
A81830-15 Attachment 03_Preliminary Plot Plan - A5J0F3   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

D Adobe Acrobat Pro Adobe Acrobat Pro Shawna Collins D
A81830-16 Attachment 04_Preliminary PID - A5J0F4   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

Attachment 4 Preliminary Process and Instrumentation Diagram.
A81829-1 NEB Permit Notice of Publication - English.pdf - A5J0D2   Date: 2017-02-23
Submitter:
TPS Corp.

The Board wishes to obtain the views of interested parties on this application before issuing a permit or recommending to the Governor in Council that the application be designated for a licencing pro...
A81830-14 Attachment 02_Technical Description - A5J0F2   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

METER STATION DESCRIPTION Pipeline Design Specifications Description of Analysis System CSA Z662-15 A Gas Chromatograph (GC) will be installed. Meter type and number Meter run wall thickness and grad...
A81830-5 Attachment 09_Engineering Matters Summary - A5J0E2   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

E6: Since component 2 (new meter station) of the Project is a metering facility, it will not be designed for passage of in-line inspection (ILI) tools. Notwithstanding this, the Project is subject to...
A81830-6 Attachment 11_Interactions Table - A5J0E4   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

Construction: Construction of the new Sales Meter Station (SMS) will require stripping and stockpiling of soils that currently support agriculture (pasture) Construction of the new NPS 20 connection ...
A81830-13 Attachment 01_LTO Exemption Request - A5J0F1   Date: 2017-02-23
Submitter:
TransCanada PipeLines Limited

TransCanada seeks exemption from the requirement to obtain LTO from the Board prior to placing the pipeline back into service following the installation of the tee assemblies and tie-ins. The custome...
Some of the material on this site originates with organizations not subject to the Official Languages Act and is available in the language in which it was written.
Certains des textes sur ce site proviennent d'organismes qui ne sont pas assujettis à la Loi sur les langues officielles et ils sont disponibles dans la langue d'origine.