My Favourites
Remove All Filters
Filtered by Other
Remove Filter
Filter by Date Last DayLast WeekLast MonthLast 3 MonthsLast 6 MonthsLast Year
(YYYY-MM-DD)
(YYYY-MM-DD)
Filter by Commodity ElectricityGasOilOther
 Filtered by: Other
This will only search for documents within selected categories.

Matching Items

Item(s) - 1 to 20 out of about 17000
A81825-1 Jan 2017 Abandonment Provision Reporting form and Letter of Credit - A5I9Z4   Date: 2017-02-23
Submitter:
William Jenkins

D Xerox WorkCentre Xerox WorkCentre D
A81822-2 NEB MO-036-2012 - Prev_Filing_Modified - A5I9Y6   Date: 2017-02-23
Submitter:
Laura Jehn, VP Asset Management

Response - With respect to Emergency Operations ATG conforms to the System Restoration Plan that is on file with the EMERA Maine System Operations Dept. and provides switching procedures for the ATG T...
A81826-3 NEB 189 Local Condensate (blackline), eff 03-13-17 - A5I9Z9   Date: 2017-02-23
Submitter:
Kinder Morgan Cochin ULC

The movement in the United States is subject to tariffs published by Kinder Morgan Cochin LLC which are filed with the Federal Energy Regulatory Commission in the United States. TABLE OF RATES (1) Ra...
A81826-2 NEB 189 Local Condensate (clean), eff 03-13-17 - A5I9Z8   Date: 2017-02-23
Submitter:
Kinder Morgan Cochin ULC

The movement in the United States is subject to tariffs published by Kinder Morgan Cochin LLC which are filed with the Federal Energy Regulatory Commission in the United States. TABLE OF RATES (1) Ra...
A81772-1 BS13 Hazardous Material Notice - A5I8Y0   Date: 2017-02-17
Submitter:
Westcoast Energy Inc., doing business as Spectra Energy Transmission

Darren Christie Director, Regulatory Affairs 403-699-1751 Direct 403-699-1585 Fax DAChristie@spectraenergy.com. Table 1: Identified Hazards, Mitigation Strategy and Disposal Identified Hazards Mitiga...
A81773-11 Notice of Motion #3 of Pembina Resource Services Canada - A5I8Z2   Date: 2017-02-17
Submitter:
Pembina Resource Services Canada

Specifically, section 16.1 states: Hereinafter “Pembina” includes, individually or collectively as applicable: Pembina, Pembina Empress NGL Partnership, and Pembina Infrastructure and Logistics LP. F...
A81775-1 Notice of Intent to Provide Oral Traditional Evidence (GHW-001-2016) - A5I8Z7   Date: 2017-02-17
Submitter:
Bigstone Cree Nation

Travel can be difficult for our elders and as we are the only intervenors providing oral traditional evidence, Bigstone hopes that this request can be accommodated.
A81749-1 Waterkeeper Letter - Comments on Ruling 1- A5I8G1   Date: 2017-02-15
Submitter:
Pippa Feinstein, JD

Sheri Young, Board Secretary National Energy Board 517 10th Avenue SW Calgary, AB T2R O8A. Dear Ms. Young, Re: Lake Ontario Waterkeeper comments concerning the need for separate review processes for ...
A81744-1 Withdrawal of Canadian Oil Sands Application to Participate, February 14, 2017 - A5I8E1   Date: 2017-02-15
Submitter:
Canadian Oil Sands Partnership #1
A81749-2 Waterkeeper Submissions - Comments on Ruling 1 - A5I8G2   Date: 2017-02-15
Submitter:
Pippa Feinstein, JD

The new Hearing Panel has also voided the previous panel’s decision to hold the Energy East and Eastern Mainline project reviews in the same hearing process and has asked for public comments concernin...
A81722-2 Engineering Assessment Report - A5I7X1   Date: 2017-02-13
Submitter:
Alliance Pipeline Ltd.

Executive Summary A quantitative risk assessment was performed on the approximately 880 m long portion of the NPS 36 Alliance pipeline that is affected by the construction of a new motel approximately...
A81722-3 Threat Assessment Report (Appendix 1 to Engineering Assessment) - A5I7X2   Date: 2017-02-13
Submitter:
Alliance Pipeline Ltd.

Apart from identifying the relevance and severity of each threat, the other primary goal of the threat assessment is to establish candidate approaches for estimating failure likelihood in that risk as...
A81722-1 Cover Letter and Summary Submission - A5I7X0   Date: 2017-02-13
Submitter:
Alliance Pipeline Ltd.

Further to an undertaking made at that time, Alliance is taking this opportunity to file an independent third-party engineering assessment addressing this potential change in class location designatio...
A81723-1 Niverville Sales MS Project Update 2_Untested Field Welds - A5I7X4   Date: 2017-02-13
Submitter:
TransCanada PipeLines Limited

On April 27, 2016, TransCanada applied to the National Energy Board (NEB or Board) pursuant to section 58 of the National Energy Board Act (Act) for approval to construct and operate the Emerson Exten...
A81692-1 Third Addendum to O-M Notification OM2017-028 - A5I7I5   Date: 2017-02-10
Submitter:
Trans-Northern Pipelines

Please provide fish habitat and fish species information at the access crossing location. TNPI Responses as follows: 1) Yes the culvert has been designed according to the latest DFO guidelines for wa...
A81695-2 Annexe III - Réplique de SCGM aux observations de TransCanada - A5I7J9   Date: 2017-02-10
Submitter:
Société en commandite Gaz Métro

TRANSCANADA PIPELINES LIMITED et al. (TransCanada) DEMANDE VISANT LE SERVICE DE TRANSPORT À PRIX FIXE LONGUE DURÉE JUSQU’À HERBERT (MODÈLE) TABLEAU RELATIF À L’OBTENTION DE RÉPONSES COMPLÈTES ET SATIS...
A81697-2 Chart for Full and Adequate Responses to IRs - Intervenor Reply - A5I7K5   Date: 2017-02-10
Submitter:
Union Gas Limited

As noted in the response, TransCanada is not privy to the arrangements between TransGas and the Power Plant or any other power or industrial shippers of TransGas. Union requests that TransCanada seek...
A81680-1 Venturion Oil Limited - MH-001-2013 - Appendix XVI - A5I7E1   Date: 2017-02-09
Submitter:
J.D. (Jim) McCormick

D Hewlett-Packard MFP D
A81682-1 Whitewood MS_List of Untested Field Welds - A5I7E6   Date: 2017-02-09
Submitter:
TransCanada PipeLines Limited

Febraury 9, 2017 Filed Electronically National Energy Board Suite 210, 517 Tenth Avenue SW Calgary, AB T2R 0A8 Attention: Ms. Sheri Young, Secretary of the Board Dear Ms. Young: Re: TransCanada PipeLi...
A81673-3 Response to Union Motion - A5I7C5   Date: 2017-02-08
Submitter:
TransCanada PipeLines Limited

Information Request How will TransCanada ensure Herbert LTFP service is only used to serve Power Plant load, and not other TransGas load on days the full 58 TJ/d is not needed for the Power Plant, reg...
Some of the material on this site originates with organizations not subject to the Official Languages Act and is available in the language in which it was written.
Certains des textes sur ce site proviennent d'organismes qui ne sont pas assujettis à la Loi sur les langues officielles et ils sont disponibles dans la langue d'origine.