Compliance Verification Activity Report: CV1617-536 - Trans-Northern Pipelines Inc.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV1617-536
Start date: 2017-03-28
End date: 2017-03-30

Team:

Regulated company: Trans-Northern Pipelines Inc.

Operating company: Trans-Northern Pipelines Inc.

Province(s) / Territory(s):

Discipline(s):

Rationale and scope:

Inspection of Integrity Dig work

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Regulatory instrument number(s):

Observations (no outstanding follow-up required)

Observation 1 - General Safety Observations - MP-191.08-2017 - Day 1

Date & time of visit: 2017-03-28 09:00

Discipline: Safety Management

Categories:

Facility:

Observations:

Sommerville is the prime contractor on site. The Sommerville site supervisor provided the site specific orientation, reviewed the tool box meeting, traffic plan, site specific emergency response plan, and TNPI permits for Sommerville and the NDT company. TNPI representatives explained the process for ensuring that the pipeline is operating at a safe pressure for the feature (s) to be assessed. TNPI had their chief inspector on site and Sommerville had safety inspector also on site.

The site had a generator that provided power for the site.  Water was being pumped out from the trench to water bags that were located close to the dig site.  NEB inspectors confirmed that the generator was properly grounded and that the pump and generator had secondary containment.  The generator had a fire extinguisher and spill kit located nearby.
 
The site has a muster point which is also used for the designate smoking area and the first aid area. There is a fire extinguisher, first aid kit and a spill kit.  The site was observed to have appropriate signage and was maintained to allow safe access along the ROW.  Site personnel noted to be wearing appropriate PPE
 

Compliance tool used: No compliance tool used

Observation 2 - Integrity Observations - MP-191.08-2017 - Day 1

Date & time of visit: 2017-03-28 09:00

Discipline: Integrity Management

Categories:

Facility:

Observations:

NEB inspectors met with TNPI representatives at the dig site. The following records were provided:

The TNPI site inspector confirmed to the NEB Inspectors that the product and the pressure of the line were checked with TNPI's Line Control prior to the beginning of work. For this site, the operating pressure was not reduced for the dig. The following observations were made:

Compliance tool used: No compliance tool used

Observation 3 - Information caviardée conformément au paragraphe 144(5) du Code canadien du travail

This information has been redacted pursuant to Section 144(5) of the Canada Labour Code

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program