Compliance verification activity type: Field Inspection
Team:
Regulated company: TransCanada PipeLines Limited
Operating company: TransCanada PipeLines Limited
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
Field inspection of construction activities occurring on the Vaughan Mainline Expansion project. Verification of compliance with company-specific program and OPR requirements. Construction Safety Manual screening done prior to field inspection (1617-515).
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Regulatory instrument number(s):
Observation 1 - Project Yard, Office - Trailers and Storage Site
Date & time of visit: 2017-01-25 09:00
Discipline: Safety Management
Categories:
Facility:
Observations:
TransCanada representatives accompanied the NEB inspection team on a walkabout inspection of facilities operated by its contractor, Banister, at 12380 Albion Road. The walkabout inspection included the Project Office, Storage Trailers and Storage Yard.Observations made:
Compliance tool used: Information Request (IR)
Regulatory requirement:
Relevant section(s):
Company action required:
Information RequestAn information request (IR) was sent by email to the Company to provide explanation for the absence of the properly completed tags or labels required by NFPA 10 “7.3.4 Annual Maintenance Record Keeping,” on the fire extinguishers observed at the 12380 Albion Vaughan Road site.
Due date: 2017-02-13
Date closed: 2017-02-10 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 2 - General "Shoofly" Observations
Date & time of visit: 2017-02-25 13:25
Terminology"Shoofly" - Jargon - a term used on the pipeline project to refer to the temporary thoroughfare by which a construction worksite is accessed.
Compliance tool used: No compliance tool used
Observation 3 - Shoofly 9 - Humber River Drilling Site
Date & time of visit: 2017-01-24 11:35
Observation 4 - Shoofly 10 - Pipe unloading.
Date & time of visit: 2017-01-24 12:52
Observation 5 - Shoofly 11 & 12 - Highway Crossing - Slip Bore - Site
Date & time of visit: 2017-01-24 13:25
Observation 6 - Shoofly 14 - Watercourse 33
Date & time of visit: 2017-01-25 14:52
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program