Compliance Verification Activity Report: CV1718-254 - Enbridge Pipelines Inc.

Overview

Compliance verification activity type: Field Inspection

Activity #: CV1718-254
Start date: 2017-11-27
End date: 2017-11-30

Team:

Regulated company: Enbridge Pipelines Inc.

Operating company: Enbridge Pipelines Inc.

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Construction inspection of the Line 3 Replacement Program, Spread 4 from Aug 2017 to April 2018. Identify primary contractors for random sample. Focus on Contractor Management program, site-specific hazards identified in the Construction Safety Manuals, other high risk activities. Also include Craik and Bethune pump stations.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Regulatory instrument number(s):

Observations (no outstanding follow-up required)

Observation 1 - General Safety Observations November 28, 2017

Date & time of visit: 2017-11-28 08:30

Discipline: Safety Management

Categories:

Facility:

Observations:

Document Review FLHA Done in Safety Trailer at SA Yard

  
Stringing at Shoe Fly 130, KP526+073 @ 50.41666 -104.80833
Bending at KP 516+900, Lat. 50.452 Long. -104.8833
Main Line Welding, KP 508+800,   Lat. 50.5001 Long -104.9833
 

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Enbridge shall have an annual inspection conducted on the fire extinguisher or replace and take out of service until it has been inspected for the annual inspection.

Due date: 2017-11-28

Date closed: 2017-11-28
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 2 - Direct Pipe Installation Safety Observation November 29th

Date & time of visit: 2017-11-29 08:36

Discipline: Management System

Categories:

Facility:

Observations:

Qu' Appelle River Crossing- Michel Direct Pipe

Compliance tool used: No compliance tool used

Observation 3 - Bethune Pump Station- Line 3 Safety Observation November 29th

Date & time of visit: 2017-11-29 11:20

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Enbridge shall have an annual inspection conducted on the fire extinguisher or replace and take out of service until it has been inspected for the annual inspection.

Due date: 2017-11-29

Date closed: 2017-11-29
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 4 - Craik Pump Station- Line 3 Safety Observation November 29th

Date & time of visit: 2017-11-29 15:50

Discipline: Safety Management

Categories:

Facility:

Observations:

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Enbridge shall have an annual inspection conducted on the fire extinguishers or replace and take out of service until it has been inspected for the annual inspection. 
Enbridge shall properly ground the fuel storage and generator prior to next use and verify to the NEB inspectors that this had been done. 

Due date: 2017-11-30

Date closed: 2017-11-30
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observation 5 - Bethune pipe yard, Coating and Lowering-in Safety Observation November 30th

Date & time of visit: 2017-11-30 10:30

Discipline: Safety Management

Categories:

Facility:

Observations:

Bethune Stock Pile Yard 50.58300000, -105.18333000

ROW Coating KP 497+200ROW Pipe Lowering-in 50 40.921 -105 27.524

Compliance tool used: Corrected Non-compliance (CNC)

Regulatory requirement:

Relevant section(s):

Company action required:

Enbridge shall submit an environmental report, clean up the spill and supply evidence to the inspectors that this has been completed.

Due date: 2017-11-30

Date closed: 2017-11-30
Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.

Reason closed: Requirement met

Compliance achieved: Yes

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program