Compliance verification activity type: Field Inspection
Team:
Regulated company: Enbridge Pipelines Inc.
Operating company: Enbridge Pipelines Inc.
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
Construction inspection of the Line 3 Replacement Program, Spread 4 from Aug 2017 to April 2018. Identify primary contractors for random sample. Focus on Contractor Management program, site-specific hazards identified in the Construction Safety Manuals, other high risk activities. Also include Craik and Bethune pump stations.
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Regulatory instrument number(s):
Observation 1 - General Safety Observations November 28, 2017
Date & time of visit: 2017-11-28 08:30
Discipline: Safety Management
Categories:
Facility:
Observations:
Document Review FLHA Done in Safety Trailer at SA Yard
Compliance tool used: Corrected Non-compliance (CNC)
Regulatory requirement:
Relevant section(s):
Company action required:
Enbridge shall have an annual inspection conducted on the fire extinguisher or replace and take out of service until it has been inspected for the annual inspection.
Due date: 2017-11-28
Date closed: 2017-11-28 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Observation 2 - Direct Pipe Installation Safety Observation November 29th
Date & time of visit: 2017-11-29 08:36
Discipline: Management System
Qu' Appelle River Crossing- Michel Direct Pipe
Compliance tool used: No compliance tool used
Observation 3 - Bethune Pump Station- Line 3 Safety Observation November 29th
Date & time of visit: 2017-11-29 11:20
Due date: 2017-11-29
Date closed: 2017-11-29 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Observation 4 - Craik Pump Station- Line 3 Safety Observation November 29th
Date & time of visit: 2017-11-29 15:50
Enbridge shall have an annual inspection conducted on the fire extinguishers or replace and take out of service until it has been inspected for the annual inspection. Enbridge shall properly ground the fuel storage and generator prior to next use and verify to the NEB inspectors that this had been done.
Due date: 2017-11-30
Date closed: 2017-11-30 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Observation 5 - Bethune pipe yard, Coating and Lowering-in Safety Observation November 30th
Date & time of visit: 2017-11-30 10:30
Bethune Stock Pile Yard 50.58300000, -105.18333000
Enbridge shall submit an environmental report, clean up the spill and supply evidence to the inspectors that this has been completed.
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program