Compliance verification activity type: Field Inspection
Team:
Regulated company: TransCanada PipeLines Limited
Operating company: TransCanada PipeLines Limited
Province(s) / Territory(s):
Discipline(s):
Related events:
Rationale and scope:
Scope: King's North Connection - Observe construction activities, such as tie-in welding, pipe handling, lowering-in and coating application and repair. In addition, conduct follow-up from previous Inspection observations CV1617-379, this may include obtaining either an update/observation on the HDD, sink hole and FBE cracking. Rationale: Pipe handling activities can impact the FBE coating which already has known issues due to previous bending. Observe and follow up on other construction activities – HDD, frac-out, tie-in welding
Compliance tool(s) used:
Facilities:
Facility Types
Life-cycle Phases
Regulatory requirements that apply to this activity:
Regulatory instrument number(s):
Observation 1 - Inspector Notes - Day 1
Date & time of visit: 2016-07-19 14:30
Discipline: Integrity Management
Categories:
Facility:
Observations:
NEB inspectors arrived at the Bolton yard site and received an overview of the activities in progress and an update since the previous NEB inspection. A safety meeting was also conducted.During this meeting, the company had remarked that:
Compliance tool used: No compliance tool used
Observation 2 - Inspector notes - Day 2
Date & time of visit: 2016-07-20 08:45
NEB inspectors arrived on site at Shoofly 14 and noted the following observations:
Compliance tool used: Information Request (IR)
Regulatory requirement:
Company action required:
Company to provide the NEB with the initial assessment conducted and all supporting documentation (eg. test results) in accordance with CSA Z662-15 Clause 5.12(b).Company to provide the updated engineering assessment that was used to determine that the pipe was fit for service, after identifying the coating cracks. Include the integrity management plan to monitor the unexamined pipe coatings under the watercourse crossings.Provide a justification for applying the FBE coating on the 15.7 WT pipe to the CSA Z245.20-2006 code in 2013, when a later revision of the code was applicable
Due date: 2016-08-12
Date closed: 2016-11-10 Note: the date closed is the date that the inspector completed their review of the company corrective actions for adequacy and determined that no further actions are required.
Reason closed: Requirement met
Compliance achieved: Yes
Identified non-compliances to company plans or procedures are non-compliances either to:
- the condition of an authorization document that requires the implementation of that plan or procedure; or
- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program