Compliance Verification Activity Report: CV1718-288 - TransCanada PipeLines Limited

Overview

Compliance verification activity type: Field Inspection

Activity #: CV1718-288
Start date: 2017-07-10
End date: 2017-07-10

Team:

Regulated company: TransCanada PipeLines Limited

Operating company: TransCanada PipeLines Limited

Province(s) / Territory(s):

Discipline(s):

Related events:

Rationale and scope:

Field Inspection of TransCanada PipeLines Ltd. (TransCanada) Line 100-1 at watercourse crossings in the Vaudreuil (valve 149) and Senneville (valve 150) areas. These areas were subject to recent floods and this inspection will focus on the current status of the watercourses and any requirements for future mitigation. This activity will be carried out in coordination with a field inspection of the Trans Québec & Maritimes Pipeline Inc. pipeline.

Compliance tool(s) used:

Facility details

Facilities:

Regulatory requirements

Regulatory requirements that apply to this activity:

Observations (no outstanding follow-up required)

Observation 1 - Watercourse Crossing in Senneville near MLV150

Date & time of visit: 2017-07-10 14:00

Discipline: Damage Prevention

Categories:

Facility:

Observations:

NEB Officers accompanied TransCanada representatives to inspect the RoW and watercourse crossing near valve site MLV150 in Senneville (QC). TransCanada representatives informed NEB Officers that this waterway qualifies as a "navigable water" as per Transport Canada.

NEB Officers observed the following:

Compliance tool used: No compliance tool used

Observation 2 - Watercourse Crossing in Vaudreuil-Dorion near MLV149

Date & time of visit: 2017-07-10 16:00

Discipline: Damage Prevention

Categories:

Facility:

Observations:

NEB Officers accompanied TransCanada representatives to inspect the RoW and watercourse crossing near valve site MLV149 in Vaudreuil-Dorion (QC). TransCanada representatives informed NEB Officers that this waterway qualifies as a "non-navigable water" as per Transport Canada.

At the location, NEB Officers observed the following:

Compliance tool used: No compliance tool used

Observations (company follow-up required)

Identified non-compliances to company plans or procedures are non-compliances either to:

- the condition of an authorization document that requires the implementation of that plan or procedure; or

- the relevant section of the regulations that requires implementation of that plan or procedure including those sections that require implementation of plans or procedures as a part of a Program